GALLERY‎ > ‎

- Work pics (1)

Coving fitted & painted, full room repaint including glosswork to comlete the job.
Coving fitted and filled ready for painting.
Problem walls filled, sanded smooth & crosslined ready for painting.
External renovation and repaint of wooden casement windows.
External renovation and repaint of wooden casement windows.
External renovation and repaint of wooden sash windows & wooden conservatory.
Real wood flooring fitted along with new skirting, full repaint to complete.
Kitchen completed: white ceiling, farrow & ball duckegg blue walls, white gloss woodwork.
Kitchen prepped & covered ready for painting.
Room was smoke damaged, Full cleandown & repaint in orchid white, firelace repainted with bla ck satin enamel, new wood effect laminate, new skirting fitted & painted.
Room painted & wallpapered to complete.
Gyproc coving being fitted.
Problem ceiling complete, "much cheaper than a overboard & reskim"
Problem ceiling (re-occuring cracks) covered with wallrock fibreliner.
Hole patch repaired.
Rental property: whoops! a very slow leak on a shower tray caused this.
Real wood flooring & new skirting fitted.
Room painted & wallpapered to complete.
Room re-skimmed.
Lounge complete.
Full lounge repaint, feature wallpaper hung to create horizontal stripes.
Feature wall complete.
Feature wallpaper being hung.
Me stripping paint off a poorly prepared surface.
livingroom completed.
Feature wallpaper being hung.
Full livingroom repaint, white ceiling, mocha & chocolate walls, white gloss woodwork.
Rental property: remedial redecoration, walls stripped & prepped, blown vinyl wallpaper being hung
Rental property completed.
Commercial work: Bar/nightclub full repaint, offwhite acrylic eggshell walls & black dancefloor area.
Bar/nightclub toilet repaint, white acrylic eggshell ceilings, black satinwood gloss to all woodwork.
Bar/nightclub vip lounge, feature wallpaper being hung.
Freehand "rattlecan" artwork on bar/nightclub vip room.
Commercial work: Full outside repaint.
Hallway: dado fitted then painted & wallpapered to complete. 
Vertical stripes being painted to create a feature wall.
Comments